We hold an HSE asbestos ancillary licence, which means we can erect and dismantle scaffolding for licensed asbestos removal where the scaffolding work is likely to disturb asbestos.
Asbestos scaffolding is scaffolding designed and built to support licensed asbestos removal work.
It covers the working platforms, access routes and structures that hold up asbestos enclosures, so the removal team can work safely and asbestos fibres stay contained. Because putting up or taking down this kind of scaffold can disturb asbestos, a licensed asbestos contractor with an asbestos ancillary licence from the Health and Safety Executive (HSE) must carry out the work.
Only a small number of UK scaffolding companies hold this licence, and CJB is one of them. We work alongside asbestos removal contractors from the planning stage, and our scaffold design and temporary works team makes sure the scaffold suits the enclosure design, the removal method and the site conditions before anyone starts work.
You need a licensed scaffolding contractor when it’s reasonably foreseeable that the scaffolding work will disturb asbestos, for example when:
Where asbestos is in good condition and the scaffold won’t disturb it (for example, sound asbestos insulating board ceiling tiles or intact pipe lagging), the work may not need a licence. If you’re not sure which applies, we’ll review your asbestos survey and advise.
Asbestos fibres can’t be seen or smelt, so exposure can happen without anyone knowing.
There is no safe level of exposure, which is why this work should only go to a scaffolding contractor with the right licence, training and health checks in place.
Working with us, your project will benefit from:
Every operative and supervisor holds licensed asbestos work training, which is refreshed every year.
Our team have medical checks every two years and are face-fit tested for their breathing equipment.
Scaffolds are planned around the enclosure, so containment stays in place from erection to dismantle.
We study the asbestos survey and visit the site to understand where the asbestos is and what condition it’s in.
We agree the scaffold design and design drawings, the enclosure layout, access routes and access to the asbestos decontamination unit.
Every job has its own risk assessment and method statement, covering team numbers, how exposure will be prevented, PPE and RPE, the asbestos zone and emergency procedures.
Where the work is notifiable, we give the HSE the required 14 days’ notice and plan timings with the removal contractor.
We build to TG20 and SG4 guidance and inspect the scaffold throughout the job.
We take the scaffold down under the same controls once the area has been cleared.
We supply scaffolding for every stage of an asbestos project, from small partial enclosures to large decommissioning work.
Structures that support full or partial enclosures and help stop fibres spreading during removal, usually built in tube and fit scaffolding so they can be shaped around the space.
Access, edge protection and fall arrest systems for asbestos cement roof removal, designed for the loads and safety needs of the job. We also provide temporary roof scaffolding to keep the building weathertight while roof sheets are removed.
Scaffolding inside contaminated areas such as boiler rooms and plant rooms, under fully controlled conditions.
Access for surveys, inspections and the work that comes before licensed removal.
Every scaffold comes with design drawings where needed, a method statement and a risk assessment as standard.
We support licensed asbestos removal projects UK-wide, from our base near Beccles.
Asbestos is commonly found in:
Based near Beccles, with projects carried out UK-wide.
HSE ancillary licence holder and full NASC member.
Experienced staff supervise every job and know how to work safely in asbestos environments.
You need one when the scaffolding work is likely to disturb asbestos, for example when the scaffold forms part of an enclosure or the asbestos is damaged. We can check your survey and confirm.
It’s a licence from the HSE that lets a company carry out work linked to licensed asbestos removal, such as putting up scaffolding, where that work could disturb asbestos.
Yes. We provide access, edge protection and fall arrest for asbestos cement roof removal, planned with the removal contractor so the roof can be stripped safely.
Licensed work usually needs 14 days’ notice to the HSE, so it helps to contact us as early as possible.
Yes. We plan the scaffold alongside the removal team so it fits their enclosure design and working method.
We cover UK-wide sites.