NCL – Temporary Bridge, Stiffkey

NCL – Temporary Bridge, Stiffkey

Apr 19, '25

Stiffkey project

This heritage sector project took place in Stiffkey, North Norfolk, where CJB Scaffolding was appointed to construct a temporary scaffold bridge across a tidal river channel. Commissioned by NCL Contractors Ltd on behalf of the National Trust, the installation provided safe access while a permanent bridge structure was being constructed. The temporary bridge spanned approximately 12 metres across to each bank and had to be fully engineered to withstand the unpredictable conditions of a tidal and muddy environment. The project was delivered over 4 weeks.

 

Project Overview

Working in a dynamic coastal environment, CJB Scaffolding designed and erected a temporary bridge structure to allow safe crossing and construction access across a tidal riverbed. The scaffold bridge needed to be submerged at high tide, meaning it had to be engineered for strength, stability, and resistance to constant water movement.

To combat the unstable ground conditions and water flow, heavy-duty concrete ‘Lego’ blocks were installed as a stabilisation base, lifted into position by forklift with a qualified driver. The scaffold deck was built using steel ladder beams and metal sheeting, creating a robust and weather-resistant surface for foot traffic and light equipment.

Weekly inspections were coordinated with tidal schedules to ensure ongoing structural integrity and safety compliance throughout the 4-week construction window.

Scope of Works

  • Scaffold bridge design for tidal river environment

  • Installation of concrete Lego blocks for underwater base support

  • Forklift and operator for precise block placement

  • Access scaffold decked with metal sheeting

  • Use of steel ladder beams to create span structure

  • Weekly scaffold inspections timed with tide cycles

 

Key Challenges & Solutions

  • Scaffold structure had to endure total submersion at high tide

  • Required stable footings in a soft, muddy riverbed

  • Water flow and erosion risks mitigated with concrete block anchoring

  • Planning and inspections scheduled around tide tables

 

Results & Achievements

  • Enabled construction access in a complex heritage and environmental setting

  • Successfully spanned 12 metres across both banks of the river

  • Scaffold performed under tidal pressures with no structural compromise

  • Delivered safely, on time, and with full environmental consideration

  • Full safety compliance under fluctuating water levels

Commercial Scaffolding

Latest Projects

Gipping Construction – Muntons Maltings, Stowmarket

Read

Gipping Construction – Ipswich Museum

Read

BMA – Oasis Tower, Gt Yarmouth

Read

Zeno Construction – Kettering Park Tower

Read

Pentaco – Hethersett Academy

Read

Masonic Lodge, Halesworth

Read

Scaffolding Association Certificate
Constructionline Logo
NASC Certificate